Micro-Satellite workshop at held at ANU

Monday 18 April 2016 10am

Last week Professor Christine Charles hosted the first Australian-Japanese workshop on making micro-satellites with the view to exploring Pocket Rocket activities, as well as CubeSat and Ground Station tracking facilities. This was a pilot workshop. One of the primary aims is to develop ANU as a training ground for micro-satellites with school and university students.

The cullmination of the workshop was the successful launch of several CanSats from the top of the 14UD accelerator tower.

Contact

Professor Christine Charles
E: christine.charles@anu.edu.au
T: (02)61258068

Further reading

read more

Related news stories

Seeing into the ground with gravity

It’s a challenge to see into the ground, but high resolution gravity measurements could be a way to reveal underground structures – caves, tunnels or even water bodies. Physicists from the Department of Quantum Sciences and Technology tried out this hypothesis at Wee Jasper, near Canberra,...

Lift-off: new thruster system in orbit

At 2 am on the 2nd of January, technology developed at the Research School of Physics lifted off aboard a Spacex rocket and was placed in orbit. The Bogong naphthalene-based thruster has been installed in a nanosatellite, or cubesat, about the size of a loaf of bread. The cubesat is one of a network...

Neurons, Lions and Electoral Boundaries - New Topological Research

Congratulations to Associate Professor Vanessa Robins, co-editor of a new book, Research In Computational Topology 2, part of the Association for Women in Mathematics series. The book comprises 12 peer-reviewed papers that came out of a computational topology workshop in 2019, spanning neuron connections...

Moth balls thrust satellites into space

The chemical in moth balls, naphthalene, will be tested in space in a new satellite rocket propulsion system, Bogong, developed at The Australian National University (ANU). Scientists have designed the innovative thruster, with a familiar odour, in only six months from design to delivery. Primary testing...